Installation Instructions

1) Secure the WC-0001-00 against a stud using 2 screws

2) Align cables with cable gates

3) Simply press cables into place

Capacity

16 14/2, 12/2 only NMD90 / NMB*

8 14/2 – 8/3 NMD90 / NMB*

8 14/2 – 8/2 AC90

8 Flexible Metal Conduit 3/8(12) to 1/2(16)

1 cable or conduit per gate

*Maximum 2 per gate NMD90 / NMB 14/2, 12/2

 

For Positioning Only

– installed horizontally within stud walls

– for cables or conduit in vertical runs only

– not to be used as support for cables or conduits

– not installed within equipment

– not installed within 300 mm of a box, switch, or receptacle opening

 

Load Rating

-No Load

-Not to be subjected to vertical loads

 

120 oC Maximum Temperature

Indoor Use Only